Sr. No Contractor Project Work Description

1

L&T Hydrocarbon Engineering Limited

ONGC's - Cluster 8 / HRP-III / NLRNC-RT2 Project

Rectification of riser and connect spool at D30-2 platform.
Jacket face survey at NQO Platform.
Installation of grout supports at B192-1 platform.
Installation of additional member on HM platform.

2

L&T Hydrocarbon Engineering Limited

ONGC's - Cluster 8 Project

Pipeline survey at D30-2 platform.

3

L&T Hydrocarbon Engineering Limited

ONGC's - HRP-III Project

Check flanged connection of tie in spool for any leaks.
If leak found, hydra tight the bolts.

4

Posh Subsea Pte Ltd.

ONGC's - SSPRP-V Project

Installation of Subsea Clamps BF & VSEB.

5

Posh Subsea Pte Ltd.

ONGC's - HRP-III Project

Installation of Barge Bumper at WIH.

6

L&T Hydrocarbon Engineering Limited

ONGC's -New Water Injection South-R (NWIS-R) Project

Demolition of Riser.
Demolition of Pipeline - 12" (124m) & 18" (240m).
Recovery of Grout Bag & Debris Removal.
Seabed survey for new jacket installation.
Installation of Tie-in spools & Gripper.
Fabrication of Tie-in Spools.
Installation of grout bags.

7

Afcons Infrastructure Limited

ONGC's - Life Extension of Well Platform Project Tender - 2

Removal of sump caission.
Removal of FWP casing.
Installation of rub strip.
Installation of Barge bumper rings.
Replacement of FRP grating at tier 1

8

Valentine Maritime Limited

ONGC's - Pipeline Replacement Project (PRP) - VI

Riser Removal
Riser Clamp Installation
Additional Member Installation

9

Valentine Maritime Limited through
Kreuz Subsea Pte. Ltd.

ONGC's - Pipeline Replacement Project
(PRP) - VI

Removal of Riser
Bow-string Installation

10

Afcons Infrastructure Limited

ONGC's - Life Extension of Well Platform Project Tender - 2

Removal of sump caission.
Removal of FWP casing.
Installation of rub strip.
Installation of Barge bumper rings.
Replacement of FRP grating at tier 1.