1 | L&T Hydrocarbon Engineering Limited | ONGC's - Cluster 8 / HRP-III / NLRNC-RT2 Project | Rectification of riser and connect spool at D30-2 platform. Jacket face survey at NQO Platform. Installation of grout supports at B192-1 platform. Installation of additional member on HM platform. |
2 | L&T Hydrocarbon Engineering Limited | ONGC's - Cluster 8 Project | Pipeline survey at D30-2 platform. |
3 | L&T Hydrocarbon Engineering Limited | ONGC's - HRP-III Project | Check flanged connection of tie in spool for any leaks. If leak found, hydra tight the bolts. |
4 | Posh Subsea Pte Ltd. | ONGC's - SSPRP-V Project | Installation of Subsea Clamps BF & VSEB. |
5 | Posh Subsea Pte Ltd. | ONGC's - HRP-III Project | Installation of Barge Bumper at WIH. |
6 | L&T Hydrocarbon Engineering Limited | ONGC's -New Water Injection South-R (NWIS-R) Project | Demolition of Riser. Demolition of Pipeline - 12" (124m) & 18" (240m). Recovery of Grout Bag & Debris Removal. Seabed survey for new jacket installation. Installation of Tie-in spools & Gripper. Fabrication of Tie-in Spools. Installation of grout bags. |
7 | Afcons Infrastructure Limited | ONGC's - Life Extension of Well Platform Project Tender - 2 | Removal of sump caission. Removal of FWP casing. Installation of rub strip. Installation of Barge bumper rings. Replacement of FRP grating at tier 1 |
8 | Valentine Maritime Limited | ONGC's - Pipeline Replacement Project (PRP) - VI | Riser Removal Riser Clamp Installation Additional Member Installation |
9 | Valentine Maritime Limited through Kreuz Subsea Pte. Ltd. | ONGC's - Pipeline Replacement Project (PRP) - VI | Removal of Riser Bow-string Installation |
10 | Afcons Infrastructure Limited | ONGC's - Life Extension of Well Platform Project Tender - 2 | Removal of sump caission. Removal of FWP casing. Installation of rub strip. Installation of Barge bumper rings. Replacement of FRP grating at tier 1. |